THE PILOT APPROACH

Start with one area.
Measure the whole result.

A useful pilot compares equivalent deliverables. Agree the required assets, drawing and report format, quality checks and complete delivery effort before expanding.

01 / DEFINE

A bounded scope

Choose an area small enough to inspect completely. Identify the records, access constraints and responsible reviewers.

02 / DELIVER

Comparable outputs

Produce the agreed drawing and report using both approaches. Record failed attempts, reviews and corrections.

03 / DECIDE

Evidence to scale

Compare accepted quality and full delivery cost. Keep first-job setup separate from assumptions about repeat work.

YOUR ASSUMPTIONS, VISIBLE

Build a pilot brief.

This worksheet stays in your browser. Download it for discussion; it does not submit a request or schedule work.

Hours for the same deliverable

Leave unknowns blank. Enter zero only when the stage has no work. These are estimates, not measured savings.

Work stageCurrent methodAssisted method

How much correction could erase the saving?

Complete the main estimate to see the correction allowance.

Leave blank until you have a scenario to test.

This adds labour at the same entered rate. It does not include new travel, equipment or access charges.

AN AGREED RESULT BEFORE A SAVINGS CLAIM

Make the pilot
decision-ready.

The worksheet estimates effort. These proposed acceptance questions help decide whether the result is useful enough to adopt.

Coverage and identity

Were all required assets and locations addressed? Count missed, inaccessible and disputed items in the result. Record the applicable drawing and source revisions.

Drawing and report quality

Did independent checks meet the agreed task requirements? Could the recipient use the delivered files? Record corrections and unresolved findings.

Complete delivery cost

Include capture, inspection, reconstruction, drawing, review, rework, equipment and acceptance. Separate first-job setup from a repeat-job estimate.

Operational fit

Test the handoff, field conditions, reviewer responsibilities and data route. Identify who can maintain the record after the pilot team leaves.

Proposed expansion rule: expand only when the owner accepts the deliverable, material gaps are resolved and the complete-cost result supports the next scope. The pilot must be allowed to show no saving.

See how a successful pilot could lead into system transition